Forum EnerGaïa 2026
Key points for designing and installing your space-only stand
Renewable energy professionals gather on 9 and 10 December 2026 at the Parc des Expositions de Montpellier in Pérols. Forum EnerGaïa brings together public and private players in the energy transition. Business meetings complement the discussions on the stands. Dedicated areas are signposted in halls A2, A4 and B3.
In the Exhibitor Area, complete your company profile and add the staff who will run the stand. You can also prepare your meeting slots, handle requests and create your badges there. Sending e-invitations and opening meeting bookings to visitors start on 8 September.
The maximum height is measured from the hall floor, raised floor included. Check the hall allocated to you before setting the height of your partitions and sign.
Provide a 2.50 m dividing wall along shared boundaries. Above this height, plan a 1 m setback from the aisles and neighbouring stands. Free-standing structures must also respect this setback and the hall ceiling.
Keep at least two thirds of each stand side facing an aisle open. The guide allows glazing and low partitions of 1.20 m, plants included. Screen partitions are prohibited. For any closure beyond the authorized third, set the closed part back 2 m from the aisle.
Send your project to Decoplus before 30 October 2026, in line with the deadline in the guide. The Architecture Department reviews the file before any construction on site. Give your stand builder the regulations and your space number so they can show the correct boundaries on their plans.
Written approval from the Architecture Department is mandatory before a space-only stand is built.
For a hanging sign, the lowest point must be at least 3 m above the floor. The highest point must stay within the hall’s height limit. Keep a 1 m setback from the aisles and neighbouring stands, and keep signage within your space.
Heavy rigging is reserved for halls A2 and B2. Scenexpo carries out the primary rigging on the building. The guide requires a feasibility study for slings. Also include lighting trusses and overhead structures in the authorization request sent to the Architecture Department.
On a space with a fire hose reel, keep 1 m clear at the front and on the sides. A pillar may be covered up to 3 m. The guide prohibits spotlights on a pillar facing a safety aisle.
Standard build-up for space-only stands starts on Monday 7 December. To work on 5 or 6 December, request an exemption through the Exhibitor Area. The exemption pass is required for vehicle access during this period. Finish installation and cleaning by Tuesday 8 December at 22:00. Vehicles stay outside the halls and the speed limit on the grounds is 15 km/h.
Parcels are accepted from 7 December at Reception B, on the south side. Write the exhibiting company’s name, the hall, aisle and stand number on each shipment. Arrange reception with your team. During the show, couriers delivering small parcels go through the information point at Reception A, on the north side.
The schedule shows dismantling from Thursday 10 December at 18:00, after the safety announcement. Enter through internal gate 1 on the north side and exit through gate 6 on the south side. The halls must be cleared by Friday 11 December at 17:00.
13 November 2026 is the stated date for returning the technical and safety sheets. Mark the location of the electrical box and water point on the services sheet. If you need a wired connection, also send your request before this deadline.
For equipped stands, the guide provides electricity from Monday 7 December and water from Tuesday 8 December. The electrical box must remain accessible to technicians and out of reach of the public. Installations downstream of the box are the exhibitor’s responsibility and must be carried out by qualified professionals.
During build-up and dismantling, bring safety shoes, a helmet and other suitable protective equipment. Installations requiring authorization are inspected before opening. Hand the inspection certificate to the safety officer.
Custom, creative and responsible stands.
Go4expo designs, produces and installs exhibition stands in France and abroad. Our expertise in modular, 100% reusable solutions lets us combine visual impact, cost control, responsiveness and waste reduction.
Our commitment rests on a simple promise:
Better Stands GOLD
The highest level of recognition in the Better Stands programme, awarded at IBC 2026 for our Globecast stand. An award that recognizes reusable stand design and our commitment to more responsible events.

Fill in the form and let's talk about your project!
The Parc des Expositions de Montpellier, route de la Foire in Pérols, hosts Forum EnerGaïa 2026 on 9 and 10 December.
30 October 2026 is the stated deadline for sending space-only stand plans for Forum EnerGaïa 2026 to Decoplus. Written approval is required before build-up.
The maximum heights at Forum EnerGaïa 2026 are 4.50 m in A2, A4 and B2, 4 m in B1, B3 and B4, and 3.50 m in A6. The raised floor is included.
Standard build-up for space-only stands at Forum EnerGaïa 2026 starts on 7 December. 5 and 6 December are available by exemption. Build-up and cleaning end on 8 December at 22:00.
Parcel deliveries for Forum EnerGaïa 2026 are accepted from 7 December 2026. Identify the company, hall, aisle and stand number, then arrange reception with your team.
18:00 on 10 December is the scheduled start in the Forum EnerGaïa 2026 schedule, subject to the safety announcement. The halls must be cleared by 17:00 on 11 December.
Two thirds of each stand side facing an aisle must remain open at Forum EnerGaïa 2026. Beyond the authorized third, the closed part must be set back 2 m from the aisle.
13 November 2026 is the stated deadline for the Forum EnerGaïa 2026 technical and safety sheets. The services sheet specifies the location of the requested connections.
Prepare your next trade show with peace of mind:
let’s talk about your eco-designed stand project now to plan every detail and stay on schedule.