Logo JEC World 2027

JEC World 2027

Your JEC World 2027 stand from design to build-up

Rules and deadlines for exhibiting at the composites show in Villepinte

Preparing your JEC World 2027 stand to exhibit from 2 to 4 March at the Paris-Nord Villepinte Exhibition Centre? Before finalizing your plans, check the permitted heights and openings, the file to submit to Decoplus and the build-up slots that apply to your space.

Key figures

45 000
Visits threshold exceeded at the 2026 edition
1 400
Exhibitors at the show in 2026
78 000
m²
Exhibition space at the 2026 edition
94
Countries represented at the 2026 edition

Who will you meet at JEC World 2027 in Villepinte?

JEC World 2027 brings together the composite materials industry from 2 to 4 March in halls 5A and 6 of the Paris-Nord Villepinte Exhibition Centre. The show gathers fibre and resin producers, part manufacturers and suppliers of machinery or inspection equipment. Visitors include buyers, research and development engineers and industrial users, particularly in aerospace, transport and construction.

The stand layout depends on what you want to show them. A large part takes up floor space and may change the delivery schedule. An operating machine must be declared in advance. If your discussions need a meeting space, the guide also provides for booking meeting rooms.

JEC World 2027 stand: which dimensions apply?

Construction and signage are limited to 5 m in height. A raised sign must be placed at least 1 m from shared boundaries. Lighting rigs without signage may reach 6 m, depending on the height available in the hall. If you plan rigging from the roof structure, the guide sets a maximum vertical load of 80 kg per pre-installed rigging point. A system with a trimmer beam must be submitted to the Viparis rigging department.

Each stand side facing an aisle may be closed over a maximum of 50% of its length, up to 6 continuous metres. A partition up to 1.30 m high counts as an opening. A transparent closure requires Decoplus approval.

Each stand must have its own dividing walls, between 2.40 and 5 m high. Provide a neutral, uniform finish, with no signage on surfaces visible to neighbours. Reused stands follow the same rules and must also be approved.

How do you get your stand project approved by Decoplus?

Before 7 January 2027, send your architecture file to Decoplus. The guide requires three dimensioned representations of the project to review the layout, heights and volume of the stand.

  • A floor plan showing the partitions, openings and equipment.
  • Elevation views for checking heights and signage position.
  • Three-dimensional views showing the whole fit-out.

The guide asks for all the documents required for the file, including the carbon footprint declaration, to be sent in a single email. If you plan to donate materials for reuse, identify the items concerned and complete the dedicated form.

Wait for Decoplus approval before building on a space-only stand. During build-up, Decoplus checks that the construction matches the approved project and may request corrections on site.

When can you build your stand and have your equipment delivered?

Official build-up for space-only stands starts on Sunday 28 February at 7:30. Early build-up requires an exemption to be requested from Clasquin Fairs & Events. The detailed access table allows a possible start on Friday 26 February for stands of at least 200 m² and on Saturday 27 February for those of 80 to 199 m², under the conditions set out in the guide.

Friday 26 February is also reserved for delivering machines that meet the size, weight and handling criteria in the guide. If this applies to you, coordinate this delivery with Clasquin ahead of build-up. On Monday 1 March, motorized machinery is not allowed into the halls, except by exceptional exemption.

On show days, deliveries are possible from 7:00 to 8:30. Register the vehicle in Viparis Logipass and arrange a Service badge in the Exhibitor Portal to access the halls. Delivery parking is limited to one hour.

How do you organize connections and access to the build-up site?

Connections and technical services are ordered from Viparis. Depending on your equipment, list your needs for electricity, water, compressed air, internet and rigging. Mark the connection points on your plans to coordinate their installation with stand build-up.

The guide announces a permanent power supply from Sunday 28 February at 8:00 to Thursday 4 March at 18:00. For an intermittent supply, check the time slots in the technical schedule. If your teams need to use tools before the scheduled power-on, the guide states that a site power box or early power-on can be requested.

To enter the halls during build-up and dismantling, everyone must have a build-up and dismantling badge, a high-visibility vest and safety shoes. Teams must keep the main aisles clear for machinery and use cutting or sanding tools fitted with a dust extraction system.

How do you dismantle the stand and hand back the space?

Space-only stand dismantling is scheduled on Thursday 4 March from 18:00, once the public has left and subject to approval by the health and safety coordinator. For equipped stands, the guide gives a slot from 17:30 to 19:00, subject to the same approval. Teams must take into account the priority given to removing sensitive equipment and wait for authorization before bringing in handling machinery.

Before taking possession of the space, pay the mandatory deposit and arrange the check-in inspection with JEC and the stand representative. Also plan for their presence at hand-back. The exhibitor remains responsible for watching the parts until they are collected by the carrier.

For a space-only stand, the guide requires clean-up before opening and removal of construction waste at dismantling. If you have declared materials for reuse, prepare their collection with the designated partner. Space-only stands must be cleared by Friday 5 March before 18:00.

Useful contacts for JEC World

Decoplus
Stand architecture file approval
Viparis Exhibitor Services
On-site connections and technical services
JEC World Exhibitor Services
Questions about your participation in the show

Go4expo's expertise for your trade shows

Custom, creative and responsible stands.
Go4expo designs, produces and installs exhibition stands in France and abroad. Our expertise in modular, 100% reusable solutions lets us combine visual impact, cost control, responsiveness and waste reduction.

Our commitment rests on a simple promise:

  • A stand that reflects your brand
  • Within your budget
  • On schedule

Better Stands GOLD

The highest level of recognition in the Better Stands programme, awarded at IBC 2026 for our Globecast stand. An award that recognizes reusable stand design and our commitment to more responsible events.

Logo Better Stands

Exhibitor deadlines

7 January 2027
Deadline for the architecture file and carbon footprint declaration
Important
23 January 2027
Deadline to note for requesting a build-up exemption from Clasquin
Important
14 February 2027
Order the relevant services on Viparis Store before surcharges apply
Important
1 March 2027
Finish build-up by 20:00 and stand clean-up by 22:00 at the latest
Important
5 March 2027
Clear space-only stands and remove dismantling waste before 18:00
Important

Build-up and dismantling schedule

Early build-up

From Friday 26 February, 7:30 to Saturday 27 February, 22:00
Début : Friday 26 February, 7:30
Fin : Saturday 27 February, 22:00
Access by exemption depending on stand size or machine delivery.

Official build-up

From Sunday 28 February, 7:30 to Monday 1 March, 20:00
Début : Sunday 28 February, 7:30
Fin : Monday 1 March, 20:00
Equipped stands from 9:00 on 1 March. Space-only stand cleaning until 22:00.

Open to the public

From Tuesday 2 March, 9:00 to Thursday 4 March, 17:00
Début : Tuesday 2 March, 9:00
Fin : Thursday 4 March, 17:00
From 9:00 to 18:00 on 2 and 3 March, then from 9:00 to 17:00 on 4 March.

Space-only stand dismantling

From Thursday 4 March, 18:00 to Friday 5 March, 18:00
Début : Thursday 4 March, 18:00
Fin : Friday 5 March, 18:00
Subject to safety clearance. Resumes on 5 March at 7:30.
Want to exhibit at JEC World and stand out?

Fill in the form and let's talk about your project!

Need a stand for JEC World 2027 ?

Frequently asked questions about JEC World

When and where does JEC World 2027 take place?

JEC World 2027 is held from 2 to 4 March at the Paris-Nord Villepinte Exhibition Centre. The show is open from 9:00 to 18:00 on 2 and 3 March, then from 9:00 to 17:00 on 4 March.

At JEC World 2027, construction and signage are limited to 5 m. Lighting rigs without signage may reach 6 m, depending on the height available in the hall.

Before 7 January 2027, send Decoplus the dimensioned plans of your stand for JEC World 2027. The file includes a floor plan, elevation views and three-dimensional views.

At JEC World 2027, you can close up to 50% of each stand side facing an aisle, up to 6 continuous metres. A transparent closure must be approved by Decoplus.

During JEC World 2027, deliveries take place from 7:00 to 8:30. Register the vehicle in Viparis Logipass and the driver's Service badge in the Exhibitor Portal.

The build-up and dismantling badge is mandatory to access the halls during these phases of JEC World 2027. Also bring a high-visibility vest and safety shoes.

Yes. At JEC World 2027, the deposit must be paid before taking possession of the space. An inspection is carried out on entry and exit with JEC and the stand representative.

Space-only stand dismantling at JEC World 2027 is scheduled from 4 March at 18:00, subject to approval by the health and safety coordinator. The space must be cleared by 5 March before 18:00.

Plan ahead to avoid unpleasant surprises

Prepare your next trade show with peace of mind:
let’s talk about your eco-designed stand project now to plan every detail and stay on schedule.