Salon MIPIM à Cannes

MIPIM 2026

Exhibiting at MIPIM 2026: technical guide and stand build-up

Deadlines, plan approval, access and safety at the Palais des Festivals in Cannes

Planning to exhibit at MIPIM 2026, from 10 to 13 March at the Palais des Festivals et des Congrès de Cannes? Prepare your stand with the 14 January and 6 February deadlines, the build-up schedule from 4 to 9 March and the construction rules. Find the fire safety obligations, vehicle access, deliveries and the essential formalities before you arrive.

Key figures

40
%
Maximum closure allowed on each side facing an aisle
15
kg
Indicative maximum load per rigging point
500
kg/m²
Maximum floor load in several halls of the Palais
60
dB(A)
Maximum sound level for audio equipment on stands

How do you get your stand plans approved for MIPIM 2026?

14 January 2026 is the deadline for submitting the technical file for exhibitors with a space-only stand at MIPIM 2026. The procedure depends on the stand package booked.

Which documents should you send depending on your stand?

  • Option A, shell scheme stand: complete the S1 form before 14 January to confirm the stand booking.
  • Option B, packaged stand: order the package before 6 February and send the S1 form if you add decorations.
  • Option C, custom stand: order before 6 February and declare additional decorations with the S1 form.
  • Option D, space only: send the signed S2 form, dimensioned plans, 3D views and fire classification reports before 14 January.

The plans must specify the dimensions, construction height and materials used. Reaction-to-fire certificates must be valid and comply with accepted French or European standards.

The Safety Officer reviews the projects, sends recommendations and authorizes their construction. Without approval of the S2 file, build-up of a space-only stand is not allowed.

Send your documents to the Exhibitor Technical Service: technique.mipim@rxglobal.com.

What heights and construction rules apply at MIPIM 2026?

The maximum height of your stand is the one shown on the plan sent by the organizer. The MIPIM 2026 guide does not set a single height for all the halls of the Palais des Festivals et des Congrès de Cannes.

Constructions must remain within the boundaries of the booked area. No decoration, lighting or display element may project into the traffic aisles.

Which rules apply to partitions?

  • Partitions along an aisle may not close more than 40% of each side.
  • Shared faces must have a smooth, plain finish, painted or covered with wall fabric.
  • Structures must be free-standing and mechanically stable.
  • Fully enclosed stands are prohibited.
  • Closed offices and meeting rooms must have the regulatory clearances.

Ceiling rigging requires approval and an order from the Palais des Festivals. The stated maximum load is about 15 kg per point. Direct fixings to the building are prohibited.

What floor loads are allowed?

The limits vary by hall: 500 kg/m² in several areas of the Palais, 400 kg/m² in Riviera 8 and 450 kg/m² in the outdoor structures. The terraces have their own limits.

Remember: check your stand plan before any manufacturing. The permitted height, pillars, permissible loads and rigging options depend on your location.

MIPIM 2026 build-up: access, badges and deliveries in Cannes

MIPIM 2026 build-up takes place from 4 to 9 March. Main construction work is scheduled from 4 to 7 March, from 07:00 to 19:00. 8 and 9 March are reserved for finishing, with a strict closing time of 18:00 on 9 March.

Shell scheme stands are accessible from 9 March at 14:00. Dismantling starts on 13 March at 19:00 and ends on 15 March at 16:00.

How do you get build-up badges?

Exhibitors use their exhibitor badge. Stand builders, drivers and technicians must get a personal badge on the SOLAR platform, to be printed before they arrive.

Wearing safety shoes and suitable personal protective equipment is mandatory during build-up and dismantling. Minors, except declared young workers, are prohibited in work areas.

Where should delivery vehicles be registered?

  • Vehicles under 3.5 tonnes: Grand parking de la plage, 9 rue Stephen Liégeard, Cannes.
  • Vehicles over 3.5 tonnes: Pierre de Coubertin sports complex car park, Cannes-la-Bocca.
  • A1 form mandatory, to be sent before 6 February to access@altec-organisation.com.

Quai Laubeuf is unavailable due to works. Vehicle access during build-up and dismantling is through the Macé barrier after registration.

No deliveries are allowed during show opening hours. A member of staff must be present to receive parcels on your stand.

Electricity, Wi-Fi and fire safety: what to plan at MIPIM?

An electrical box, daily cleaning and basic Wi-Fi access are included in the services described for shell scheme and space-only stands at MIPIM 2026.

Stands of 9 to 15 m² have a 3.5 kW box. Stands over 15 m² get a 7 kW box. Any direct work inside the boxes is prohibited.

How do you access the show Wi-Fi?

The free Palais des Festivals WiFi network can be used in particular to check emails and use the show app. It is not suitable for video streaming. For greater needs, the guide recommends a dedicated connection from Viapass.

What are the fire safety obligations?

  • Provide the fire classification reports for the materials concerned.
  • Use wired, tempered or laminated glass, with supporting documents.
  • Keep emergency exits and aisles completely clear.
  • Provide access suitable for people with reduced mobility for raised floors.
  • Remove combustible packaging before the show opens.

Floors over 20 mm must comply with the accessibility provisions described in the regulations, in particular the requirements for sloped edges.

A safety commission inspects the stands on site. Any changes needed for compliance are at the expense of the exhibitor and their stand builder.

Cocktails, terraces and dismantling: what are the obligations at MIPIM?

6 February 2026 is the deadline for declaring cocktails and activities organized on stands at MIPIM 2026, using the E1 form.

Catering must be provided by caterers approved by the Palais des Festivals and SEMEC. Packaged food offered on stands and drinks benefit from the exceptions set out in the guide.

What are the rules for events on stands?

  • Declare cocktails and activities using the E1 form.
  • Keep all equipment and installations within the stand boundaries.
  • Limit the sound level of audio equipment to 60 dB(A).
  • Complete the SACEM formalities if music is used.

Can you set up an outdoor terrace?

Terraces are intended for welcoming and hosting guests, with no closed extension of the stand. Outdoor heaters are prohibited. The fit-outs allowed vary depending on the structures and the hall terraces.

For terraces of the outdoor structures, perimeter partitions are limited to 1.10 m. Other terraces may allow specific fit-outs, subject to technical approval.

What should you do with materials after the show?

Dismantling must be completed on 15 March at 16:00. You must remove structures, floor coverings, packaging and waste. Abandoned items may be destroyed at the exhibitor’s expense.

Remember: organize waste removal and return transport before the show opens. The organizer does not provide automatic storage for equipment that is not collected.

Useful contacts for MIPIM

Exhibitor Technical Service – RX France
Plan approval, stand compliance and technical formalities
Exhibitor Technical Desk – Cannes
On-site technical assistance during build-up, the show and dismantling
ALTEC Organisation
Registration of heavy goods vehicles and delivery vehicles

Go4expo's expertise for your trade shows

Custom, creative and responsible stands.
Go4expo designs, produces and installs exhibition stands in France and abroad. Our expertise in modular, 100% reusable solutions lets us combine visual impact, cost control, responsiveness and waste reduction.

Our commitment rests on a simple promise:

  • A stand that reflects your brand
  • Within your budget
  • On schedule

Better Stands GOLD

The highest level of recognition in the Better Stands programme, awarded at IBC 2026 for our Globecast stand. An award that recognizes reusable stand design and our commitment to more responsible events.

Logo Better Stands

Exhibitor deadlines

14 January 2026
Send the S1 form for a shell scheme stand, or the S2 file, plans and certificates for a space-only stand.
Important
6 February 2026
Order packaged or custom stands and send the E1 and A1 forms for events and deliveries.
Important
4 March 2026
Stand build-up starts at the Palais des Festivals et des Congrès de Cannes, with access from 07:00.
9 March 2026
Build-up must end by 18:00. Shell scheme stands are available from 14:00.
Important
10 March 2026
MIPIM 2026 opens at 09:00, with early exhibitor access from 08:30.
15 March 2026
Dismantling must end by 16:00. All equipment, decor and waste must have left the halls.
Important

Build-up and dismantling schedule

Main construction build-up

From Wednesday 4 March, 07:00 to Saturday 7 March, 19:00
Début : Wednesday 4 March, 07:00
Fin : Saturday 7 March, 19:00
Technicians and stand builders have access from 07:00 to 19:00 each day.

Stand finishing

From Sunday 8 March, 07:00 to Monday 9 March, 18:00
Début : Sunday 8 March, 07:00
Fin : Monday 9 March, 18:00
Access until 22:00 on 8 March and 18:00 on 9 March. No main construction work on 9 March.

MIPIM 2026

From Tuesday 10 March, 09:00 to Friday 13 March, 15:00
Début : Tuesday 10 March, 09:00
Fin : Friday 13 March, 15:00
Open from 09:00 to 19:00, closing at 15:00 on the last day.

Stand dismantling

From Friday 13 March, 19:00 to Sunday 15 March, 16:00
Début : Friday 13 March, 19:00
Fin : Sunday 15 March, 16:00
Continuous dismantling. Complete removal before 16:00 on 15 March.
Want to exhibit at MIPIM and stand out?

Fill in the form and let's talk about your project!

Need a stand for MIPIM 2026 ?

Frequently asked questions about MIPIM

What are the dates of MIPIM 2026 in Cannes?

MIPIM 2026 takes place from 10 to 13 March 2026 at the Palais des Festivals et des Congrès de Cannes. The show is open from 09:00 to 19:00 from 10 to 12 March, then from 09:00 to 15:00 on 13 March.

Stand build-up for MIPIM 2026 starts on 4 March at 07:00. Main construction work ends on 7 March. 8 and 9 March are reserved for finishing, closing at 18:00 on 9 March.

14 January 2026 is the deadline for submitting the plans and S2 safety file for space-only stands at MIPIM 2026. The Safety Officer must approve the project before build-up.

The maximum stand height at MIPIM 2026 is shown on the individual plan provided by the organizer. It depends on the location within the Palais des Festivals et des Congrès de Cannes.

At MIPIM 2026, a partition along an aisle may not close more than 40% of the length of each side. A 10-metre side can therefore have at most 4 metres of closed partition.

MIPIM 2026 build-up badges must be requested on the SOLAR platform and printed before arrival. They are personal, non-transferable and mandatory for stand builders and technicians.

MIPIM 2026 delivery vehicles must be registered with the A1 form before 6 February. Vehicles over 3.5 tonnes go through the Pierre de Coubertin car park in Cannes-la-Bocca.

At MIPIM 2026, the shell scheme stands and space-only stands described in the guide include a 3.5 or 7 kW electrical box depending on the area, as well as free basic Wi-Fi access.

Yes, cocktails on stands at MIPIM 2026 must be declared before 6 February with the E1 form. Catering is reserved for approved caterers, subject to the exceptions provided.

Stand dismantling at MIPIM 2026 starts on 13 March at 19:00 and must end by 15 March at 16:00. All equipment, structures and waste must be removed before this deadline.

Plan ahead to avoid unpleasant surprises

Prepare your next trade show with peace of mind:
let’s talk about your eco-designed stand project now to plan every detail and stay on schedule.