Salon des Maires et des Collectivités Locales 2026
Design and approval rules for exhibiting on a space-only stand
The Salon des Maires et des Collectivités Locales brings together elected officials, local authority teams and their public, private and non-profit partners. Exhibitors present solutions for local authorities, in particular in the fields of urban planning, mobility and the energy transition.
Your fit-out can include both a display area visible from the aisle and a space for discussing visitors’ projects. If you plan a demonstration, size the welcome area so that the public can watch it from inside the stand.
23 October 2026 is the deadline for sending the fit-out project for a space-only stand and declaring your stand builder or decorator in the exhibitor area. The digital file, in PDF or JPG, must include at least a plan view and an elevation, both dimensioned.
For a space-only stand, send the plans to the Décoplus firm and the show’s technical department. For a double-decker project, the regulations also require prior declaration to the sales department and give its address in the dedicated section.
If you install a raised floor, show the access on the plans submitted for approval. The organizer may ask for any fit-out it has not approved to be dismantled.
Construction height is limited to 3 m or 4 m depending on the zone shown on the hall plan. The plan also distinguishes areas where rigging is prohibited from those where a hanging sign or lighting truss may reach 4 m or 5 m depending on the zone.
The regulations give a maximum load of 3 t/m² in hall 7.1 and in the southern part of hall 7.2. The limit is 600 kg/m² in the northern part of hall 7.2 and in hall 7.3. For a heavy machine or a structure that concentrates its weight on a few supports, send the installation’s specifications to the technical department.
Post coverings are limited to 3 m. They must rest on a support independent of the building structure. Walls, floors and posts must remain intact.
A stand side facing an aisle may be closed over a maximum of 50% of its length, up to 6 m. The regulations count glazing, curtains, drapes and screen partitions as closures. Beyond the authorized threshold, the closure must be set back 2 m from the aisle along the whole stand side.
Constructions over 2.50 m high along an aisle or shared boundary must be set back 1 m. Between two neighbouring stands, provide a dividing wall. Surfaces facing the neighbour must remain a neutral color, with no graphics or signage.
Place furniture and decor within your space. Make storeroom and storage doors open inwards to keep the aisles clear.
In areas where rigging is allowed, plan a 50 cm setback from the stand boundaries. Leave at least 50 cm between the top of the constructions and the bottom of the hanging sign. The whole must keep the stand open and see-through.
Viparis carries out the rigging to the hall’s roof structure. To check feasibility at your location, send it the plan and position of the stand. The regulations require an inspection of rigged elements before they are lifted and a stability report to be presented before the show opens.
Free-standing signs follow the construction heights. An illuminated sign may be allowed, with steady lighting. White lettering on a green background is reserved for emergency exit signs.
A stand with a raised floor must provide an accessible route at least 0.90 m wide. The regulations specify the permitted slopes depending on the length of the route. They also require a reception counter usable from a wheelchair, at a maximum height of 0.80 m, with knee clearance.
Double-decker stands are only allowed around the edges of the halls, from 80 m² of floor space and subject to technical approval by the venue. The upper floor may cover up to 50% of the floor area. The whole must stay within the zone’s permitted construction height.
If a post has a fire hose reel, leave a 1 m passage around the equipment and from the nearest aisle. Furniture and partitions must allow its door to open fully.
Demonstrations are limited to 75 dB and commercial activities or broadcasts to 15 minutes per hour. Plan enough space to accommodate spectators on the stand and keep the aisles clear.
If you use a sound system, its power supply must be linked to the hall’s evacuation alarm system. The regulations require a control unit to be requested from Viparis.
Custom, creative and responsible stands.
Go4expo designs, produces and installs exhibition stands in France and abroad. Our expertise in modular, 100% reusable solutions lets us combine visual impact, cost control, responsiveness and waste reduction.
Our commitment rests on a simple promise:
Better Stands GOLD
The highest level of recognition in the Better Stands programme, awarded at IBC 2026 for our Globecast stand. An award that recognizes reusable stand design and our commitment to more responsible events.

Fill in the form and let's talk about your project!
23 October 2026 was the deadline for sending space-only stand plans and declaring the stand builder or decorator for Salon des Maires 2026.
Construction height is limited to 3 m or 4 m at Salon des Maires 2026, depending on the zone shown on the hall plan.
At Salon des Maires 2026, closure along an aisle is limited to 50% of the stand side and to 6 m. Beyond that, the closure must be set back 2 m along the whole stand side.
Viparis carries out the rigging to the roof structure at Salon des Maires 2026. Whether a sign can be hung depends on the zone and technical feasibility.
Salon des Maires 2026 allows double-decker stands around the edges of the halls from 80 m² of floor space, subject to technical approval. The upper floor is limited to 50% of the floor area.
The Salon des Maires 2026 regulations require an accessible route at least 0.90 m wide for stands on a raised floor. The access must appear on the plans submitted for approval.
Salon des Maires 2026 sets a maximum of 75 dB for demonstrations. Commercial activities and broadcasts are limited to 15 minutes per hour.
Prepare your next trade show with peace of mind:
let’s talk about your eco-designed stand project now to plan every detail and stay on schedule.