On 25 and 26 November, Workplace Meetings 2026 brings together workplace professionals at the Palais des Festivals et des Congrès in Cannes. The format is built around one-to-one meetings between hosted buyers and exhibitors. For a company presenting fit-out solutions or workplace-related services, the stand also serves as a meeting place.
The guide provides a table and three chairs for an equipped stand with one schedule. With two schedules, the package includes two such sets. If you customize your layout, arrange the furniture and display materials according to the seating needed and access from the aisle.
Construction height is limited to 3 m in the Riviera hall. Stands must remain open onto the aisles, with at most one third of the stand side closed along each aisle. Panel or decor surfaces visible from neighbouring stands must be smooth and plain, painted white or covered with white wall fabric.
The Palais allows the assembly of prefabricated elements. Prepare structures and floors before they arrive on site. Minor on-site adjustments are tolerated provided they create no risk or nuisance.
Send your decoration plans at least one month before opening to the Weyou Group technical department. If you are using a stand builder, declare them to the organizer and send a copy of the technical file.
The specifications of the Palais des Festivals et des Congrès in Cannes are available in the “Regulations” tab of the exhibitor area. There you will find the safety questionnaire and the electrical compliance certificate, both to be returned to the safety officer.
Also upload to the technical platform the plan showing the location of your electrical box. Choose this location according to the furniture and devices that need power. Moving the box on site is charged.
A space-only stand is marked out on the floor. Partitions, furniture, electrical connection and cleaning must be arranged separately. Any floor covering must be removable without damage. The guide allows removable double-sided tape and prohibits permanent gluing, paint and filler on the floors.
The equipped stand includes 2.40 m partitions, a standard sign without logo, carpet, spotlights, a power supply, furniture and basic cleaning. The partitions supplied must remain intact. Holes, glue, paint and staples are prohibited.
The 6 m² discovery stand includes a table and three chairs, among other things. The 4 m² start-up or starter package includes a high table and two bar stools. Furniture models may vary.
During build-up and dismantling, register each vehicle at the holding car park before going to the Bistingo delivery barrier, next to the casino. Only handling equipment may move inside the halls. Mark your parcels with the show name, the stand number and name, and the recipient.
On Wednesday 25 November, deliveries are allowed from 7:30 to 8:45. On Thursday 26 November, they are allowed from 8:00 to 8:45. Have someone on site to receive the parcels. The guide requires them to be collected by the end of dismantling at the latest.
Build-up badges are handed out at the delivery entrance. Keep them for dismantling. Enter the show’s personal badges in your exhibitor area, then collect them from the organizer’s office.
Before 14:00 on Tuesday 24 November, access to the hall is restricted to people wearing safety shoes. The guide announces a relaxation from 14:00 for installation, with closed shoes required. Protective equipment must remain suited to the work. A helmet is mandatory in particular for work under suspended loads or at height.
Finish the fit-out before the safety commission’s inspection. A representative must be present on the stand and able to show the fire reaction certificates for the materials. Prepare these documents with your stand builder before build-up.
Aisles must remain clear. Arrange removal of empty packaging before opening. The guide states that no storage room is set aside for it.
Dismantling starts on Thursday 26 November at 19:00. The 18:30 closing time given in the guide leaves a gap before operations begin. Removal of decor, equipment and goods must be completed by 22:30.
Coordinate the return of vehicles and collection of parcels with your contractors. The space must be returned to its original condition, after removing floor coverings, adhesive tape and decorative elements. The exhibitor remains responsible for any damage caused by their contractors. A waste removal service can be ordered in the online shop.
Custom, creative and responsible stands.
Go4expo designs, produces and installs exhibition stands in France and abroad. Our expertise in modular, 100% reusable solutions lets us combine visual impact, cost control, responsiveness and waste reduction.
Our commitment rests on a simple promise:
Better Stands GOLD
The highest level of recognition in the Better Stands programme, awarded at IBC 2026 for our Globecast stand. An award that recognizes reusable stand design and our commitment to more responsible events.

Fill in the form and let's talk about your project!
Workplace Meetings 2026 is held on 25 and 26 November in the Riviera hall of the Palais des Festivals et des Congrès in Cannes.
Construction height is limited to 3 m at Workplace Meetings 2026. Double-decker stands and rigging are prohibited.
Space-only stand build-up at Workplace Meetings 2026 is scheduled on Monday 23 November from 14:00 to 20:00 and on Tuesday 24 November from 8:00 to 20:00.
Send the decoration plans for Workplace Meetings 2026 to the Weyou Group technical department at least one month before opening.
Enter the personal badges for Workplace Meetings 2026 in the exhibitor area, then collect them from the organizer's office when you arrive.
Clear your Workplace Meetings 2026 space by 22:30 on Thursday 26 November at the latest. Dismantling starts at 19:00.